Residue dewatering machine - メーカー・企業と製品の一覧

Residue dewatering machineの製品一覧

1~2 件を表示 / 全 2 件

表示件数

[Case Study] Dehydrating 50 tons of vegetable waste per day

We handle everything from creating layout designs, designing equipment sets, manufacturing, delivery, to installation!

Two DM60 units with a processing capacity of 3 tons per hour have been installed and are designed to operate for 8 hours, processing a total of approximately 50 tons of vegetable residues through dewatering. Although the processing capacity is the same for both units (DM60), the equipment is differentiated based on the nature of the materials (the right unit is for vegetable and fruit residues for feed production, while the left unit is for composting vegetable and fruit residues). A large hopper has been installed on the screw conveyor for transportation, allowing a large quantity of vegetable residues to be loaded at once, which reduces the number of loading cycles and improves work efficiency. [Overview] - Two DM60 units with a processing capacity of 3 tons per hour have been installed. - Designed to operate for 8 hours, processing a total of approximately 50 tons of vegetable residues through dewatering. - Equipment is differentiated based on the nature of the materials. - Allows for the loading of a large quantity of vegetable residues at once. - Reduces the number of loading cycles, thereby improving work efficiency. *For more details, please refer to the related links or feel free to contact us.*

  • Water Treatment

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Case Study] Kumamoto Prefecture Craft Whiskey Maker

Designed the temporary receiving hopper in a large size! A case where the entire system was made in an L-shape.

We would like to introduce a case where a dedicated malt processing device was installed for a craft whiskey maker in Kumamoto Prefecture. With the establishment of a new distillery, a malt residue dewatering machine was introduced. Due to the request to discharge the entire amount of malt from the mash tun (1 ton) at once, we designed a large-sized temporary receiving hopper. Since the installation space was limited, the entire system was designed and arranged in an L-shape. 【Overview】 ■Challenges - Establishment of a new distillery, with a desire to discharge the entire amount of malt from the mash tun (1 ton) at once. ■Results - Designed a large-sized temporary receiving hopper. - Since the installation space was limited, the entire system was designed and arranged in an L-shape. - The dewatered malt is processed into feed, adopting an eco-feed system. *For more details, please refer to the related links or feel free to contact us.

  • Water Treatment

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録